Industry Energy storage Updated 28 Sep 2026 Price 23 Oct 2026

If management hits its targets, one share in 12 months

$5.59 → $6.77

If management hits its targets

from IR material and Earnings Calls

What one share would be worth today and in 12, 24 and 36 months if the company does exactly what its management has promised, next to what a share costs now. Worked out from the targets management gave in its own results decks and earnings calls.

$6 → $7

Show the math

hold today's enterprise value multiple — about 3× the gross profit the last stated fiscal 2026 guide implied — and grow revenue at the 22-30% a year management prints on its own order book, with no margin expansion, because none is guided. Then take off net debt of $53M and divide by 184.6M shares growing at the pace of the last half. Each figure management gave as a range is taken at its middle.

0$2$5$8$10$12Today (Oct 2026): $6, the market price$6TodayOct 202612 months (Oct 2027): $7 a share if management delivers$712 monthsOct 202724 months (Oct 2028): $9 a share if management delivers$924 monthsOct 202836 months (Oct 2029): $11 a share if management delivers$1136 monthsOct 2029
SharesTodayIn 12 monthsOct 2027In 24 monthsOct 2028In 36 monthsOct 2029
Past pace: all sharesClass A plus Class B-1, up 0.7% a year in the half to Jul '26; the $400M of converts are not in this line$6$7186M sh$9188M sh$11189M sh
Show the math, step by step

How we got there: company value if the plan is delivered, minus debt, divided by all the shares, including the new ones they’d have to sell to pay for it.

  1. The multiple. Today's enterprise value over the gross profit the guided year implied — the August 2026 deck's $2,900-3,100M of revenue at the 11-13% adjusted gross margin management guided in November 2025. That is about 3×. On the revenue the 2026-09-16 8-K actually guided, about $2.4bn, and the roughly 7% margin the first nine months delivered, the same enterprise value is nearer 9x.
  2. Why the cut does not move the chart. In this model the value of each year is today's enterprise value compounded at the growth rate: the revenue base cancels out of it and sets only the multiple above. So the chart would be the same had the base been the lower, newer figure. The September guidance is not quotable here because that 8-K is not in the deck archive, and the rule is that every input is located in a document, never typed.
  3. The unguided years. Management has guided no year after fiscal 2026 and has promised a fiscal 2027 plan with the fiscal 2026 results. The stated driver used instead is the pair of compound rates on its own Q3 '26 slide: 22% a year for backlog, $4.5bn to $6.4bn, and 30% for pipeline, $20.9bn to $33.1bn. The research record's reading of the 10-Q gives a similar step — 48-53% of the $6.4bn backlog is expected as revenue inside twelve months.
  4. Per share. Company value less net debt, divided by the share count. Net debt is $53M today: $392M of converts at carrying value against $339M of cash. The share count is economic — 143.2M Class A plus 41.4M Class B-1, which is exchangeable one-for-one — and grows at 0.7% a year, the pace of the half to 31 Jul 2026. The $400M of 2.25% converts due 2030 stay out of the count because their $21.35 conversion price is above every figure here.
  5. What this is not. It is the arithmetic of management's own stated numbers, on a company that has missed four annual guides in two years.

Promises vs. what happened

16 claims · 8 decks

Every target management put in a slide deck, and whether they hit it, missed it, or quietly dropped it.

PromiseMade inWhat happened
FY25 adjusted gross margin 10-15%Q4 '2413.7%, a recordHeld
ARR about $145M by end FY25Q4 '24$148M — never cutHeld
Smartstack's first contract delivers in FY26Q2 '25operating by May '26Held
US module and enclosure lines at capacity by end '25Q3 '25about $300M below planLate
Domestic suppliers OBBBA-compliant by end '25Q3 '25stated compliant May '26Late
First hyperscaler order in Q3 '26Q2 '26$550M in July, one month lateLate
FY26 adjusted gross margin 11-13%Q1 '26left the slide; 9M ran about 7%Dropped
ARR about $180M by end FY26Q4 '25$163M at Q3; held unchangedOpen
Q4 '26 order intake above $1.44B; liquidity about $900MQ3 '26open — $863M at Jun '26Open
FY25 revenue $3.6-4.4B, EBITDA $160-200MQ4 '24$2.26B — cut three timesMissed
FY25 adjusted EBITDA $180M midpointQ4 '24$19.5M, 89% belowMissed
Tariffs: minimal, about $10MQ1 '25a $700M revenue cut, 3 months laterMissed
FY26 revenue growth 30%+Q1 '25guided flat, then cut; line never repeatedMissed
95% of FY25 revenue covered by backlogQ2 '25landed at 84% of the midpointMissed
FY26 revenue $3.2-3.6B, fully backlog-coveredQ4 '25cut to $2.9-3.1B, then about $2.4BMissed
FY26 adjusted EBITDA $40-60MQ4 '25to -$30M/+$10M, then about -$200MMissed

What they’re pitching

the headline page, deck by deck

The headline from each quarterly results deck over two years, so you can see what they want you to focus on, and when it changes.

Q4
'24
Q1
'25
Q2
'25
Q3
'25
Q4
'25
Q1
'26
Q2
'26
Q3
'26

Domestic contentOff page one Q4 '25

GuidancePage one since Q1 '26

BacklogPage one since Q2 '25

TariffsOff page one Q4 '25

OBBBAOff page one Q4 '25

Data centresPage one since Q3 '26

SmartstackOff page one Q2 '25

Order intakeNew Q4 '25 · Page one since Q2 '26

MarginsOff page one Q3 '26

on the headline page further in the deck not in the deck▲ onto page one▼ off page one● first mentionTap a mark for the quote.

US domestic content and supply chain

Q4 '24 · headline page

“Rapid Innovation o Strengthening US domestic offering to meet customer demand Executive Summary”

Deck Q4 FY2024 Earnings Presentation · p. 4 ·

US domestic content and supply chain

Q1 '25 · headline page

“U.S. demand and our domestic content advantage.”

Deck Q1 FY2025 Earnings Presentation · p. 4 ·

US domestic content and supply chain

Q2 '25 · headline page

“Long-term advantage from US domestic content strategy”

Deck Q2 FY2025 Earnings Presentation · p. 4 ·

US domestic content and supply chain

Q3 '25 · headline page

“First U.S. domestic content-compliant storage system delivered”

Deck Q3 FY2025 Earnings Presentation · p. 4 ·

US domestic content and supply chain

Q4 '25 · further in the deck

“Leading Domestic Content with Ability to Deliver 100% Non-Chinese Product 10© Fluence Energy, Inc. All rights reserved.”

Deck Q4 FY2025 Earnings Presentation · p. 10 ·

US domestic content and supply chain

Q1 '26 · further in the deck

“Strengthening Our Domestic Supply Chain Advantage 8”

Deck Q1 FY2026 Earnings Presentation · p. 8 ·

US domestic content and supply chain

Q2 '26 · further in the deck

“Second domestic cell supply secured for FY2027”

Deck Q2 FY2026 Earnings Presentation · p. 10 ·

US domestic content and supply chain

Q3 '26 · further in the deck

“Bankable Domestic Content”

Deck Q3 FY2026 Earnings Presentation · p. 9 ·

Guidance cut, held or reaffirmed

Q1 '25 · headline page

“FY 2025 financial guidance lowered primarily due to customer-driven delays in signing certain contracts and to competitive pressures.”

Deck Q1 FY2025 Earnings Presentation · p. 4 ·

Guidance cut, held or reaffirmed

Q2 '25 · headline page

“FY25 revenue and adjusted EBITDA guidance lowered accordingly”

Deck Q2 FY2025 Earnings Presentation · p. 4 ·

Guidance cut, held or reaffirmed

Q3 '25 · headline page

“Expect to be at bottom end of revenue guidance range of $2.6B primarily due to slower US production ramp than expected and shifting of expected revenue to FY26”

Deck Q3 FY2025 Earnings Presentation · p. 5 ·

Guidance cut, held or reaffirmed

Q1 '26 · headline page

“Reiterate FY2026 guidance ranges”

Deck Q1 FY2026 Earnings Presentation · p. 4 ·

Guidance cut, held or reaffirmed

Q2 '26 · headline page

“Reaffirming FY2026 Revenue, ARR, and adjusted EBITDA guidance ranges”

Deck Q2 FY2026 Earnings Presentation · p. 4 ·

Guidance cut, held or reaffirmed

Q3 '26 · headline page

“FY26 guidance reduced for revenue and adjusted EBITDA, primarily driven the ramp up of new contract manufacturing facilities in the U.S. and internationally”

Deck Q3 FY2026 Earnings Presentation · p. 4 ·

Record backlog and pipeline

Q4 '24 · further in the deck

“Backlog Grew 55% Year-Over-Year”

Deck Q4 FY2024 Earnings Presentation · p. 6 ·

Record backlog and pipeline

Q1 '25 · further in the deck

“Record Backlog Grew 38% Year-Over-Year Providing Continued”

Deck Q1 FY2025 Earnings Presentation · p. 7 ·

Record backlog and pipeline

Q2 '25 · headline page

“Robust liquidity ($1B+) and ~$4.9B backlog to support navigation of current environment”

Deck Q2 FY2025 Earnings Presentation · p. 4 ·

Record backlog and pipeline

Q3 '25 · headline page

“$2.5B of FY’26 revenue now secured in backlog;”

Deck Q3 FY2025 Earnings Presentation · p. 5 ·

Record backlog and pipeline

Q4 '25 · headline page

“Record year-ending backlog of ~$5.3 billion 13.7% adjusted gross margin2 for FY’25, an all-time high”

Deck Q4 FY2025 Earnings Presentation · p. 4 ·

Record backlog and pipeline

Q1 '26 · headline page

“Record backlog of ~$5.5 billion”

Deck Q1 FY2026 Earnings Presentation · p. 4 ·

Record backlog and pipeline

Q2 '26 · headline page

“A Record Level with upside”

Deck Q2 FY2026 Earnings Presentation · p. 4 ·

Record backlog and pipeline

Q3 '26 · headline page

“Q3’26 ending backlog of $6.4 billion, ~14% growth over Q2’26 and a company record”

Deck Q3 FY2026 Earnings Presentation · p. 4 ·

Tariffs on Chinese batteries

Q1 '25 · further in the deck

“FLNC Sees Minimal Tariff Exposure in 2025; Domestic Content”

Deck Q1 FY2025 Earnings Presentation · p. 10 ·

Tariffs on Chinese batteries

Q2 '25 · headline page

“Certain US project execution and order intake paused due to US tariff uncertainty”

Deck Q2 FY2025 Earnings Presentation · p. 4 ·

Tariffs on Chinese batteries

Q3 '25 · headline page

“All paused U.S. contracts reactivated after tariff/regulatory clarity”

Deck Q3 FY2025 Earnings Presentation · p. 4 ·

Tariffs on Chinese batteries

Q4 '25 · further in the deck

“Current Tariffs on Chinese Battery Imports 3.4%”

Deck Q4 FY2025 Earnings Presentation · p. 24 ·

Tariffs on Chinese batteries

Q1 '26 · further in the deck

“Current Effective Tariffs Through September 20261”

Deck Q1 FY2026 Earnings Presentation · p. 21 ·

Tariffs on Chinese batteries

Q2 '26 · further in the deck

“Imports On or Before 7/24/26 38.4% 10%”

Deck Q2 FY2026 Earnings Presentation · p. 23 ·

Tariffs on Chinese batteries

Q3 '26 · further in the deck

“On Imports as of 7/25/26 40.9% 12.5%”

Deck Q3 FY2026 Earnings Presentation · p. 19 ·

OBBBA and PFE compliance

Q3 '25 · headline page

“Favorable outcome for energy storage in recently passed legislation (OBBBA);”

Deck Q3 FY2025 Earnings Presentation · p. 5 ·

OBBBA and PFE compliance

Q4 '25 · further in the deck

“Advancing our Strategy to Secure OBBBA-Compliant Battery”

Deck Q4 FY2025 Earnings Presentation · p. 11 ·

OBBBA and PFE compliance

Q1 '26 · further in the deck

“Prohibited Foreign Entity (PFE)”

Deck Q1 FY2026 Earnings Presentation · p. 8 ·

OBBBA and PFE compliance

Q2 '26 · further in the deck

“OBBBA, Including PFE Restrictions 10”

Deck Q2 FY2026 Earnings Presentation · p. 10 ·

OBBBA and PFE compliance

Q3 '26 · further in the deck

“PFE Restrictions for Manufacturing are Complex but Workable 21”

Deck Q3 FY2026 Earnings Presentation · p. 21 ·

Data centers

Q4 '24 · further in the deck

“U.S. electricity demand1 is projected to rise ~15-20% in the next decade, driven primarily by AI, data center growth, domestic manufacturing, and sector-wide electrification.”

Deck Q4 FY2024 Earnings Presentation · p. 5 ·

Data centers

Q3 '25 · further in the deck

“At least $8.5 Billion Additional TAM from Behind-The-Meter”

Deck Q3 FY2025 Earnings Presentation · p. 10 ·

Data centers

Q4 '25 · further in the deck

“Over 30 GWhs1 of data center projects currently in pipeline or leads”

Deck Q4 FY2025 Earnings Presentation · p. 7 ·

Data centers

Q1 '26 · further in the deck

“~36 GWhs1 of data center projects currently in pipeline or leads as of today”

Deck Q1 FY2026 Earnings Presentation · p. 7 ·

Data centers

Q2 '26 · further in the deck

“Master supply agreements (MSA) executed with 2 major hyperscalers”

Deck Q2 FY2026 Earnings Presentation · p. 6 ·

Data centers

Q3 '26 · headline page

“Secured ~$850 million of data center business including the Company’s first large, behind-the-meter order signed during the quarter and awards from a hyperscaler in July”

Deck Q3 FY2026 Earnings Presentation · p. 4 ·

Smartstack product

Q1 '25 · headline page

“Breakthrough technology offering to be launched on Thursday, Feb 13.”

Deck Q1 FY2025 Earnings Presentation · p. 4 ·

Smartstack product

Q2 '25 · further in the deck

“SmartstackTM: Leading Safety, Cost, and Density”

Deck Q2 FY2025 Earnings Presentation · p. 9 ·

Smartstack product

Q4 '25 · further in the deck

“Fluence Awarded 4 GWh Project; Largest Battery Storage”

Deck Q4 FY2025 Earnings Presentation · p. 6 ·

Smartstack product

Q1 '26 · further in the deck

“Smartstack’s density well-positioned to compete in this segment”

Deck Q1 FY2026 Earnings Presentation · p. 7 ·

Smartstack product

Q2 '26 · further in the deck

“First Smartstack Project Commences Operation 9”

Deck Q2 FY2026 Earnings Presentation · p. 9 ·

Smartstack product

Q3 '26 · further in the deck

“Smartstack 10 announced 1 2 3 4”

Deck Q3 FY2026 Earnings Presentation · p. 9 ·

Order intake momentum

Q4 '25 · further in the deck

“Q4’25 Record”

Deck Q4 FY2025 Earnings Presentation · p. 5 ·

Order intake momentum

Q1 '26 · further in the deck

“Over $750 million of Order Intake Driven by Steady Increase In”

Deck Q1 FY2026 Earnings Presentation · p. 5 ·

Order intake momentum

Q2 '26 · headline page

“Order intake of ~$2 billion through May 6, 2026, more than double the same period in 2025”

Deck Q2 FY2026 Earnings Presentation · p. 4 ·

Order intake momentum

Q3 '26 · headline page

“Q3’26 order intake of ~$1.44 billion, a record quarter for Fluence”

Deck Q3 FY2026 Earnings Presentation · p. 4 ·

Margin records

Q4 '24 · further in the deck

“First Profitable Year; Delivered Profitable Growth”

Deck Q4 FY2024 Earnings Presentation · p. 12 ·

Margin records

Q3 '25 · headline page

“Strong Q3 performance driving margins above target”

Deck Q3 FY2025 Earnings Presentation · p. 5 ·

Margin records

Q4 '25 · headline page

“Record year-ending backlog of ~$5.3 billion 13.7% adjusted gross margin2 for FY’25, an all-time high”

Deck Q4 FY2025 Earnings Presentation · p. 4 ·

Margin records

Q2 '26 · headline page

“Q2’26 adjusted gross margin1 of 11.1%”

Deck Q2 FY2026 Earnings Presentation · p. 4 ·

What they keep talking about · 11

The themes that show up deck after deck, and the ones that disappear.

Domestic content
On the headline slide of all four FY25 decks, then demoted to a later page from Q4 '25 — the same quarter the US factories started missing their plan.
Guidance
A guidance change leads six of the eight decks, and four of them are cuts. The one word that never appears on a headline slide is a raise.
Backlog
Record backlog in all eight: $4.5bn to $6.4bn. Coverage of the revenue guide was given at 65%, 85%, 95%, 98% and then "fully covered" — before each of the cuts.
Tariffs
"Minimal... about $10 million" in February '25; the next deck paused US projects and took $700M off the guide. The tariff table moved to the appendix from Q4 '25.
OBBBA
New in Q3 '25 when the law passed, with a compliance date of end-2025. The May '26 deck states the US supply chain fully compliant, one to two quarters late.
Data centres
A demand statistic in FY25, its own slide from Q4 '25, and the lead in Q3 '26 with about $850M of orders — the first new story in two years that is not a cost.
Smartstack
Launched February '25, a 4 GWh European award in November, first project operating by May '26, Smartstack 10 announced in August. The one roadmap that ran on time.
Order intake
Became a lead theme in FY26, exactly as the revenue guide was being held and then cut: about $2bn through May, then a record $1.44bn quarter.
Margins
On the headline slide when the quarter was 15.4% or 13.7%, absent when it was 5.6% or 5.9%.
New
Q3 '26: the first behind-the-meter data-centre order, a hyperscaler award, and a planned international cell supply agreement said to offer "increased margin visibility".
Quiet
The FY26 margin range, the rolling twelve-month margin chart, the opex table, the free-cash-flow chart and the backlog split all stopped. The margin range went without a word.
Every quarterly report we’ve saved · 8

The press releases and shareholder letters behind this page.

Archived as text; the links open the copies filed on EDGAR or the investor-relations site.

What analysts asked them

8 calls · Q4 24 – Q3 26

The last eight earnings calls: what analysts kept asking about, which questions got dodged, and how much the CEO did the talking.

Share of questions by topic, call by call. A topic that suddenly dominates is usually the problem. The last row is how much of the answering the CEO did, rather than the CFO or others.

Share of questions about…Q4 24Q1 25Q2 25Q3 25Q4 25Q1 26Q2 26Q3 26
Demand & customers28%23%26%56%33%31%24%53%
Growth & sales13%15%·17%19%9%24%21%
Pricing & margins21%54%6%28%33%19%16%16%
Guidance & outlook15%38%10%22%24%16%4%26%
Capacity & supply·12%16%22%57%41%52%53%
Capital & financing5%4%3%·5%12%12%·
Competition8%15%6%·10%12%4%16%
Products & technology3%15%·17%5%3%16%11%
Macro & regulation3%12%19%33%5%16%·5%
Other54%15%61%11%10%34%20%16%
Questions3926311821322519
How much the CEO talked79%89%77%90%80%93%89%92%

Who’s in charge, who’s selling

read from the filings · 1 Oct 2026

Shareholder votes against the board and pay, plus which executives have been selling their own shares.

  1. Tier 1 · stable

    59% of the vote on 22% of the shares, and three governance exemptions taken

    Class B-1 carries five votes a share and AES Grid Stability holds all of it — 66.1% of the combined vote at the January 2026 record date, 59.1% after the May secondary, on 22.4% of the economics. AES and Siemens each nominate up to three directors, Qatar Holding one. Four of the twelve elected in March 2026 were affirmatively independent, and the board relies on Nasdaq's controlled-company exemptions from a majority-independent board, a wholly independent compensation committee and independent nominations. The charter waives the corporate-opportunity doctrine for those holders and their designees, opts out of DGCL section 203 and needs 66 2/3% of the vote to amend.

  2. Tier 1 · stable

    A quarter of revenue is bought by the controlling shareholder

    AES affiliates bought $555.1M of the $2,262.8M of fiscal 2025 revenue, 24.5% of it, and owed $199.9M at year end. Siemens affiliates run the other way, supplying $79.8M of cost of goods. The contracts are back-to-back: Fluence signs with AES or Siemens, who have signed with the end customer. The chief executive, chief financial officer, chief legal officer, chief customer officer and the new chief operating officer all came from AES. The SEC's investigation is understood to cover "certain service contracts with related parties".

  3. Tier 1 · live

    An SEC investigation into the one number a holder cannot check

    A formal SEC investigation into financial reporting, open since 2024 and still open at 30 June 2026, is understood to cover revenue recognition, a material weakness, software capitalisation and related-party service contracts — the subjects of a February 2024 short-seller report. Ernst & Young's single critical audit matter for fiscal 2025 is percentage-of-completion revenue on $2,172M of storage sales. A class action was dismissed without prejudice in March 2026; derivative suits followed in July.

  4. Tier 2 · worsening

    Half the share count is registered for resale, and $480M was sold at $21

    The May 2026 shelf registers about 94.7M founder shares, roughly half the 184.6M economic count, to May 2029. Three days after filing it AES sold 10,066,414 shares at $21.00, Siemens Pension Trust 10,066,414 at $20.53 and Qatar Holding 2,867,172 at $21.00; the insider data sets count $480.1M of sales and no purchases in the year to June 2026, 0.3% of it pre-planned. Class A was $23.82 in January and $7.55 at the end of September. Officers and directors together hold under 1%.

  5. Tier 3 · worsening

    Six of eight reported measures stopped, the margin guide among them

    KPI persistence across the eight decks is 0.25: the adjusted EBITDA headline tile, the annual margin range, the rolling twelve-month margin chart, the opex table, the backlog split and the pipeline-by-market table all went. The fiscal 2026 margin range of 11-13%, given with "clear visibility" in February 2026, left the guidance slide in May without being withdrawn, while the nine-month margin ran about 7%.

Where shareholders voted no

At each annual meeting shareholders vote on who sits on the board, what the executives are paid and whether the company may create more shares. These are the votes that drew the most "no"s at the last two meetings: the shares voted against (or withheld) each year, then what share of all votes cast that was. Under each one, what the vote was about and what a no means.

20252026Share 2026
Falú (AES designee)A board seat. Shareholders vote to keep this person on the board, the group that hires, pays and can fire the CEO. A no, or a withheld vote, says they want this director out, often because of the committee they sit on or a decision they signed off.15.0M26.4M withheld7.8%
Meier (Siemens designee)A board seat.18.2M20.1M withheld5.9%
Bulls (independent chair)A board seat.13.8M17.0M withheld5.0%
Nebreda (chief executive)A board seat.12.6M11.4M withheld3.4%
Say on payExecutive pay. Shareholders say whether they accept what the top executives were paid. The vote is advisory: the board can ignore it, but a large no is a public rebuke and boards usually change the pay plan after one.7.4M2.9M against0.9%

Insiders who sold the most stock

Reported sales by executives and directors, biggest first.

Form 4s and the SEC insider data sets, Jul '25-Jun '26SoldNote
AES Grid Stability$211.4M10,066,414 shares at $21.00 in the 15 May secondary; 41.4M Class B-1 held after
Siemens Pension Trust$206.7M10,066,414 at $20.53, then a code-J disposal of 20,462,735 on 6 Jul
Qatar Holding$60.2M2,867,172 at $21.00; 11,801,103 held after
All insiders, counted$480.1M9 sales by 5 holders and not one purchase — 0.3% of it pre-planned
After the cuttwo buysthe chairman 10,000 and the audit chair 7,000 shares at $7.36 on 21 Sep