The Ledger

IRENIREN Limited

Industry Bitcoin miner AI pivot Updated 28 Sep 2026 Price 23 Oct 2026

If management hits its targets, one share in 12 months

$24.91 → $51.71

What the podcasts say

0 bullish · 1 bearish · 1 speaker · 1 show

What investors said about this company on the podcasts we transcribe, newest first. Bullish means the speaker expects the stock to do well, bearish means they expect it to do badly.

  1. Bearish
    Noble: rather short neoclouds like IREN than NVIDIAGeorge Noble · Monetary Matters with Jack Farley · 23 Oct 2026

All 1 statement on the Podcast Heatmap

If management hits its targets

from IR material and Earnings Calls

What one share would be worth today and in 12, 24 and 36 months if the company does exactly what its management has promised, next to what a share costs now. Worked out from the targets management gave in its own results decks and earnings calls.

$25 → $52

Show the math

company value if delivered, less net debt, divided by the shares. Value holds today's multiple — 3× the project earnings on the ARR management guides for the end of 2026 — on the ARR each year's live capacity would earn: 0.8 GW of IT load in 2027 and 0.5 GW more a year after that, at $13.3-20m per IT megawatt. The share count keeps growing at the pace it has actually grown, 41% a year, and the converts turn into 127M shares. Each figure management gave as a range is taken at its middle.

0$20$40$60$80Today (Oct 2026): $25, the market price$25TodayOct 202612 months (Oct 2027): $52 a share if management delivers$5212 monthsOct 202724 months (Oct 2028): $65 a share if management delivers$6524 monthsOct 202836 months (Oct 2029): $66 a share if management delivers$6636 monthsOct 2029
SharesTodayIn 12 monthsOct 2027In 24 monthsOct 2028In 36 monthsOct 2029
Past pace, all shares + convertsshares +41% a year as in the half to Aug '26, plus the 127M shares the six convertible series are struck for$25$52724M sh$65967M sh$661307M sh
Show the math, step by step

How we got there: company value if the plan is delivered, minus debt, divided by all the shares, including the new ones they’d have to sell to pay for it.

  1. ARR. Management targets ">$4bn" of operating ARR at 31 December 2026 — GPU/hour pricing on commissioned GPUs only, the definition it adopted in the Q4 '26 deck. Today's value is 3× the project earnings that implies at the ~85% project EBITDA margin the Microsoft contract was sold on, and that multiple is held. ARR is not revenue: the deck says recognised revenue "may be materially lower".
  2. Capacity. 0.3 GW of IT load live at the end of 2026 and 0.8 GW at the end of 2027 — management's own two capacity targets — then the same 0.5 GW step in 2028 and 2029. The 2028+ slide lists 4,400 MW gross still to build at Sweetwater, Kiowa, Bundey and Badajoz, so the pace is inside what they describe; the years are this page's extension of it, and ERCOT's Batch Zero study decides the Texas ones.
  3. Pricing. $13.3-20m of revenue per IT megawatt a year. The low end is management's own $4bn over its own 0.3 GW, which Microsoft's 200 MW at $1.94bn a year pulls it down to; the high end is the ">$20m per MW (IT)" recent three-year contracts were signed at. The "~$25m" in active discussions is left out.
  4. The capex is not in this. Fiscal 2027 capex is guided at $25-30bn against about $14bn of cash and committed financing. That guide straddles two capacity steps and also covers long-term growth, so charging it to a single year would be a figure this page invented; it is left out, and so is interest. What is charged instead is the dilution the company has actually been running at.
  5. Arithmetic. (company value − net debt) ÷ shares. Net debt today is $1.7B; turning the converts into stock takes the company to net cash, which flatters the later years. Today: $25 × 394.1M shares is the market value, counted at 14 Aug 2026.

Promises vs. what happened

16 claims · 8 decks

Every target management put in a slide deck, and whether they hit it, missed it, or quietly dropped it.

PromiseMade inWhat happened
50 EH/s by mid-2025Q2 '2550 EH/s installedHeld
Sweetwater 1 substation, Apr '26Q1 '25on schedule, 15 months outHeld
~$2.5bn of Microsoft GPU financingQ1 '26$3.6bn at ~6%Held
Funding need under $250m in 2025Q3 '25covered, and moreHeld
Horizon 1 delivered Q4 '25Q3 '25accepted Aug '26Late
AI Cloud $200-250m run rate by Dec '25Q4 '25~$69m; passed two quarters lateLate
23k Prince George GPUs by Q1 '26Q1 '26commissioned in AugustLate
Horizon capex $6-7m per IT MWQ3 '25withdrawn, never replacedDropped
Microsoft's 200 MW in phases through 2026Q1 '26Horizon 2-4 due Q4 '26Open
Sweetwater 2 energised late 2027Q4 '25now "from 2028"Open
$3.4bn ARR by end '26Q1 '26raised to >$4bn, then redefinedOpen
$1bn ARR Sep '26, >$4bn Dec '26Q4 '26$1bn hit in August; Dec openOpen
FY27 capex $25-30bn, $14bn in handQ4 '26the gap is the whole caseOpen
Mining held at 50 EH/sQ4 '25decommissioned; $638.8m written offMissed
Sweetwater let whole-of-siteQ2 '25no tenant; building it themselvesMissed
Investor distributions in 2025Q1 '25deferred one deck laterMissed

What they’re pitching

the headline page, deck by deck

The headline from each quarterly results deck over two years, so you can see what they want you to focus on, and when it changes.

Q1
'25
Q2
'25
Q3
'25
Q4
'25
Q1
'26
Q2
'26
Q3
'26
Q4
'26

MiningOff page one Q4 '25

ARRPage one since Q1 '26

HorizonPage one since Q2 '26

PowerOff page one Q4 '26

SweetwaterOff page one Q4 '26

MicrosoftOff page one Q3 '26

FinancingPage one since Q2 '26

CustomersPage one since Q2 '26

on the headline page further in the deck not in the deck▲ onto page one▼ off page one● first mentionTap a mark for the quote.

Bitcoin mining scale and cost

Q1 '25 · headline page

“¢ §0 EH/s expansion accelerated ¢ Negotiations with parties on additional ¢ Transition to US domestic issuer status in from H2 to HI 2025 Al monetization opportunities 2025 (including US GAAP reporting)”

Deck Q1 FY25 Results Presentation · p. 4 (OCR) ·

Bitcoin mining scale and cost

Q2 '25 · headline page

“Mining capacity increased ~50% from 2 1 EH/s to 31 EH/s”

Deck IREN Q2 FY25 Results Presentation · p. 3 ·

Bitcoin mining scale and cost

Q3 '25 · headline page

“50 EH/s installed capacity by June 30”

Deck IREN Q3 FY25 Results Presentation · p. 3 ·

Bitcoin mining scale and cost

Q4 '25 · further in the deck

“GPU-as-a-Service Large scale, low-cost Bitcoin production”

Deck IREN FY25 Results Presentation · p. 4 ·

Bitcoin mining scale and cost

Q1 '26 · further in the deck

“17% increase in average operating hashrate following continuing expansion at”

Deck IREN Q1 FY26 Results Presentation · p. 19 ·

Bitcoin mining scale and cost

Q2 '26 · further in the deck

“ Q2 financials reflect a transition period as the business shifts from Bitcoin mining toward AI Cloud”

Deck IREN Q2 FY26 Results Presentation · p. 15 ·

AI Cloud GPU expansion and ARR

Q1 '25 · headline page

“¢ $1EH/s next month ¢ Measured growth of Al Cloud Services ¢ Focused on alternative funding instruments”

Deck Q1 FY25 Results Presentation · p. 4 (OCR) ·

AI Cloud GPU expansion and ARR

Q3 '25 · headline page

“Revenues increasing with new contracts”

Deck IREN Q3 FY25 Results Presentation · p. 3 ·

AI Cloud GPU expansion and ARR

Q4 '25 · further in the deck

“Scaling from 1.9k to 10.9k GPUs in the coming months”

Deck IREN FY25 Results Presentation · p. 4 ·

AI Cloud GPU expansion and ARR

Q1 '26 · headline page

“140k GPU expansion by end of 2026”

Deck IREN Q1 FY26 Results Presentation · p. 3 ·

AI Cloud GPU expansion and ARR

Q2 '26 · headline page

“ Targeted 140k GPU expansion on track to deliver $3.4bn AI Cloud ARR by end of CY262”

Deck IREN Q2 FY26 Results Presentation · p. 3 ·

AI Cloud GPU expansion and ARR

Q3 '26 · headline page

“ $3.1bn ARR under contract1”

Deck IREN Q3 FY26 Results Presentation · p. 5 ·

AI Cloud GPU expansion and ARR

Q4 '26 · headline page

“ $4bn contracted ARR for 2026 capacity; $1bn operating ARR today1,2”

Deck IREN FY26 Results Presentation · p. 5 ·

Childress liquid-cooled Horizon build

Q1 '25 · headline page

“¢ Liquid cooling infrastructure for Blackwell ¢ Strong operating cashflows to support”

Deck Q1 FY25 Results Presentation · p. 4 (OCR) ·

Childress liquid-cooled Horizon build

Q2 '25 · headline page

“New 75MW liquid-cooled data center at”

Deck IREN Q2 FY25 Results Presentation · p. 3 ·

Childress liquid-cooled Horizon build

Q3 '25 · headline page

“Horizon 1 - Up to 50MW (IT load) liquid-cooled capacity targeting Q4 2025 delivery”

Deck IREN Q3 FY25 Results Presentation · p. 3 ·

Childress liquid-cooled Horizon build

Q4 '25 · further in the deck

“Childress (750MW): Horizon 1 on track for Q4 2025, with site works and procurement underway for Horizon 2 – second 50MW IT load liquid-cooled data center”

Deck IREN FY25 Results Presentation · p. 5 ·

Childress liquid-cooled Horizon build

Q1 '26 · further in the deck

“Accelerating construction of Horizon 1-4”

Deck IREN Q1 FY26 Results Presentation · p. 9 ·

Childress liquid-cooled Horizon build

Q2 '26 · headline page

“ Horizon 1-4 construction progressing to schedule for $9.7bn Microsoft contract”

Deck IREN Q2 FY26 Results Presentation · p. 3 ·

Childress liquid-cooled Horizon build

Q3 '26 · headline page

“ Horizon 1 GPU commissioning underway”

Deck IREN Q3 FY26 Results Presentation · p. 5 ·

Childress liquid-cooled Horizon build

Q4 '26 · headline page

“ Horizon 1 delivered to Microsoft, first of four 50MW (IT) deployments;”

Deck IREN FY26 Results Presentation · p. 5 ·

Secured grid-connected power

Q1 '25 · further in the deck

“Prince George | SOMW 2,510MW contracted power”

Deck Q1 FY25 Results Presentation · p. 13 (OCR) ·

Secured grid-connected power

Q2 '25 · headline page

“2,310MW of grid-connected power secured”

Deck IREN Q2 FY25 Results Presentation · p. 3 ·

Secured grid-connected power

Q4 '25 · further in the deck

“ 2,910MW of contracted grid-connected power, plus multi-GW development pipeline”

Deck IREN FY25 Results Presentation · p. 16 ·

Secured grid-connected power

Q1 '26 · headline page

“Leverages just 16% of ~3GW secured grid-connected power”

Deck IREN Q1 FY26 Results Presentation · p. 3 ·

Secured grid-connected power

Q2 '26 · headline page

“ New 1.6GW site in Oklahoma increasing secured grid-connected power to >4.5GW”

Deck IREN Q2 FY26 Results Presentation · p. 3 ·

Secured grid-connected power

Q3 '26 · headline page

“ Secured power increased to 5GW”

Deck IREN Q3 FY26 Results Presentation · p. 5 ·

Secured grid-connected power

Q4 '26 · further in the deck

“>$4bn year-end ARR target represents <10% of the 5GW+ data center pipeline1 2027 +”

Deck IREN FY26 Results Presentation · p. 24 ·

Sweetwater hub

Q1 '25 · further in the deck

“¢ Progressing development of 1.4GW Sweetwater data center project”

Deck Q1 FY25 Results Presentation · p. 12 (OCR) ·

Sweetwater hub

Q2 '25 · headline page

“Developing new 600MW Sweetwater 2 site, to create 2GW Sweetwater Data”

Deck IREN Q2 FY25 Results Presentation · p. 3 ·

Sweetwater hub

Q3 '25 · headline page

“Sweetwater 1 - 1.4GW April 2026 energization”

Deck IREN Q3 FY25 Results Presentation · p. 3 ·

Sweetwater hub

Q4 '25 · further in the deck

“Sweetwater 1 (1.4GW) energization on track for April 2026”

Deck IREN FY25 Results Presentation · p. 15 ·

Sweetwater hub

Q1 '26 · further in the deck

“Sweetwater 1 (1.4GW) scheduled for April 2026”

Deck IREN Q1 FY26 Results Presentation · p. 11 ·

Sweetwater hub

Q2 '26 · further in the deck

“Data center procurement and civil works progressing, with phased capital deployment”

Deck IREN Q2 FY26 Results Presentation · p. 8 ·

Sweetwater hub

Q3 '26 · headline page

“ Sweetwater 1 energized on schedule”

Deck IREN Q3 FY26 Results Presentation · p. 5 ·

Sweetwater hub

Q4 '26 · further in the deck

“Bulk substation complete”

Deck IREN FY26 Results Presentation · p. 14 ·

Microsoft contract

Q1 '26 · headline page

“$9.7bn contract value”

Deck IREN Q1 FY26 Results Presentation · p. 3 ·

Microsoft contract

Q2 '26 · headline page

“ Horizon 1-4 construction progressing to schedule for $9.7bn Microsoft contract”

Deck IREN Q2 FY26 Results Presentation · p. 3 ·

Microsoft contract

Q3 '26 · further in the deck

“ Horizon 1 super cluster scheduled for Microsoft handoff in Q3 CY26”

Deck IREN Q3 FY26 Results Presentation · p. 9 ·

Microsoft contract

Q4 '26 · further in the deck

“First of four 50MW (IT)”

Deck IREN FY26 Results Presentation · p. 12 ·

Financing the build

Q1 '25 · headline page

“¢ $1EH/s next month ¢ Measured growth of Al Cloud Services ¢ Focused on alternative funding instruments”

Deck Q1 FY25 Results Presentation · p. 4 (OCR) ·

Financing the build

Q2 '25 · headline page

“Growth funding via convertible note proceeds, ATM facility, reinvesting operating cashflows, along with c ontinued evaluation of additional funding structures”

Deck IREN Q2 FY25 Results Presentation · p. 3 ·

Financing the build

Q3 '25 · headline page

“Advisors engaged across multiple debt financing workstreams, anticipating execution in coming months as markets continue to stabilize”

Deck IREN Q3 FY25 Results Presentation · p. 3 ·

Financing the build

Q4 '25 · further in the deck

“NEAR-TERM GROWTH CAPEX FULLY FUNDED”

Deck IREN FY25 Results Presentation · p. 18 ·

Financing the build

Q1 '26 · further in the deck

“$1bn zero-coupon convertible notes issued”

Deck IREN Q1 FY26 Results Presentation · p. 15 ·

Financing the build

Q2 '26 · headline page

“ $3.6bn GPU financing secured for Microsoft contract at <6% interest rate1”

Deck IREN Q2 FY26 Results Presentation · p. 3 ·

Financing the build

Q3 '26 · headline page

“ Strong balance sheet with $2.6bn cash at Apr 302”

Deck IREN Q3 FY26 Results Presentation · p. 5 ·

Financing the build

Q4 '26 · headline page

“ $6.5bn GPU financings in past 3 months; with prepayments, funds >100% of associated GPU capex 5Note: Refer to assumptions and notes on page 26”

Deck IREN FY26 Results Presentation · p. 5 ·

Customer diversification

Q2 '26 · headline page

“ Strongest customer demand to date, with multiple advanced negotiations as execution continues and financing progresses”

Deck IREN Q2 FY26 Results Presentation · p. 3 ·

Customer diversification

Q3 '26 · headline page

“ $3.4bn 5-year AI Cloud contract with NVIDIA”

Deck IREN Q3 FY26 Results Presentation · p. 5 ·

Customer diversification

Q4 '26 · headline page

“ New multi-year cloud contracts, including with a leading frontier AI lab”

Deck IREN FY26 Results Presentation · p. 5 ·

What they keep talking about · 10

The themes that show up deck after deck, and the ones that disappear.

Mining
The headline through Q3 '25 — 21, then 31, then 50 EH/s. Off page one after Q1 '26, and from Q2 '26 it appears only as falling revenue and impairments: $180.3m a quarter down to $66.7m.
ARR
GPU counts first (1.9k, 10.9k, 140k, 150k), then ARR from Q1 '26: $3.4bn, $3.7bn, ">$4bn". Redefined in Q4 '26 to commissioned GPUs only, which is $1bn.
Horizon
Liquid cooling for Blackwell in Q1 '25, named Horizon 1 in Q2 '25, "targeting Q4 2025 delivery" in Q3 '25, delivered to Microsoft in Q4 '26. Horizon 2-4 now target Q4 2026.
Power
The number that only goes up: 2.3GW, 2.9GW, ~3GW, >4.5GW, 5GW, "5GW+ announced pipeline" — with Oklahoma, Spain and Australia added. The Q4 '26 deck uses it to say the ARR target is under 10% of the pipeline.
Sweetwater
In all eight decks and the one date that held: the 1.4GW substation was promised for April 2026 in November 2024 and energised on schedule. The data centres on it are 2027 and "from 2028".
Microsoft
Signed November 2025 at $9.7bn over five years, on the highlights slide in Q1, Q2 and Q4 '26. The contract redefined Horizon 1 and pushed its delivery three quarters.
Financing
On page one of six of the eight. "Alternative funding instruments", then converts and the ATM, then "NEAR-TERM GROWTH CAPEX FULLY FUNDED", then $3.6bn, then $6.5bn of GPU financings in three months.
Customers
Microsoft alone until Q3 '26, then NVIDIA at $3.4bn, then in Q4 '26 "a leading frontier AI lab" unnamed, with Cohere, Perplexity, Figure AI and others listed.
New
Q4 '26: revenue per IT megawatt as a chart (3-year pricing +125%), prepayments at 45-55% of GPU capex, a ~2 year payback, and the first FY27 capex guide — $25-30bn.
Quiet
Hashrate stopped after Q1 '26, the power price with it, cost per bitcoin after Q4 '25, and the illustrative $714m of mining EBITDA at 50 EH/s after the FY25 deck. Actual best quarter: $121.9m.
Every quarterly report we’ve saved · 8

The press releases and shareholder letters behind this page.

Archived as text; the links open the copies filed on EDGAR or the investor-relations site.

What analysts asked them

8 calls · Q1 25 – Q4 26

The last eight earnings calls: what analysts kept asking about, which questions got dodged, and how much the CEO did the talking.

Share of questions by topic, call by call. A topic that suddenly dominates is usually the problem. The last row is how much of the answering the CEO did, rather than the CFO or others.

Share of questions about…Q1 25Q2 25Q3 25Q4 25Q1 26Q2 26Q3 26Q4 26
Demand & customers25%33%11%38%75%53%44%56%
Growth & sales··22%23%·20%6%25%
Pricing & margins12%17%11%31%12%13%12%25%
Guidance & outlook12%8%·8%·20%6%12%
Capacity & supply12%33%22%46%38%33%50%75%
Capital & financing25%8%22%38%19%13%25%44%
Competition···15%·7%··
Products & technology6%17%11%62%38%33%31%6%
Macro & regulation·8%··6%···
Other44%33%67%·12%13%31%6%
Questions161291316151616
How much the CEO talked88%59%63%48%50%36%50%47%

Who’s in charge, who’s selling

read from the filings · 1 Oct 2026

Shareholder votes against the board and pay, plus which executives have been selling their own shares.

  1. Tier 1 · worsening

    Pay stopped being performance pay

    Fiscal 2025 pay was $72.6m for each co-CEO against $6.7m the year before, mostly the June 2025 retention grant whose price hurdles ran from $20 to $50 against a $7.72 average. Five of the six are below today's price. Then on 1 July 2026 the board granted 9,099,328 units to each of them — 4.6% of the company — vesting on continued employment only, with no performance condition and no further grant until fiscal 2031. Because of the B Class shares, each of those shares carries sixteen votes.

  2. Tier 2 · stable

    Fifteen votes a share, and the founders never face a vote

    Each co-CEO holds one of the two B Class shares, entitled to fifteen votes for every ordinary share its holder owns: 2.3% of the shares each and 21.8% of the votes each at the proxy date, 43.5% for all directors and officers. The constitution amended in November 2025 requires "Non-Founder Directors" to stand at each annual meeting, in classes sunsetting from 2030, and excludes the two Founder Directors. No director stood at the 2025 meeting.

  3. Tier 2 · worsening

    The share count is the funding plan, and the funding question was dodged twice

    Shares up 77% in fourteen months, 41% annualised in the latest half. Live sources: $3.5bn unsold of a $6bn at-market programme, $6.75bn of converts struck as low as $13.64, 39.7m shares issued in December 2025 to buy back part of two series, and the co-CEO units. Against a fiscal 2027 capex guide of $25-30bn with about $14bn in hand. Asked how the rest is financed, the CFO said "we have a range of financing sources available to us" and the co-CEO, a quarter later, "we'll let you know when we close one."

  4. Tier 3 · improving

    Auditor changed, weakness remediated, class action dismissed

    KPMG replaced Raymond Chabot Grant Thornton in November 2025 with no disagreement disclosed — the one red disclosure flag in three years. The material weakness disclosed in the FY2024 20-F/A was remediated by 30 June 2025, and for fiscal 2026 controls were effective and attested. The 2022 securities class action was dismissed with prejudice and is on appeal.

  5. Tier 3 · worsening

    Six measures were dropped, and ARR was redefined in the quarter it became checkable

    Hashrate, the illustrative mining EBITDA sensitivity, cost per bitcoin, the power price, the GPU count and the AI Cloud monthly run rate all stopped; persistence across the eight decks is 0.33. Until Q3 FY26, ARR counted a signed contract's average annual value before any GPU was live; from Q4 FY26 it counts GPU/hour pricing on commissioned GPUs — $0.5bn at June, $1bn in August, against ">$4bn" contracted.

Where shareholders voted no

At each annual meeting shareholders vote on who sits on the board, what the executives are paid and whether the company may create more shares. These are the votes that drew the most "no"s at the last two meetings: the shares voted against (or withheld) each year, then what share of all votes cast that was. Under each one, what the vote was about and what a no means.

20242025Share 2025
Say on pay (advisory)Executive pay. Shareholders say whether they accept what the top executives were paid. The vote is advisory: the board can ignore it, but a large no is a public rebuke and boards usually change the pay plan after one.—29.4M12.0%
2025 Omnibus Incentive PlanStock to pay staff and executives. Lets the company create new shares to hand out as pay. Every new share makes each existing share a slightly smaller slice of the company, so a no says shareholders think the dilution is too much.—29.3M12.0%
Forum selection provisionWhere shareholders may sue. Requires lawsuits against the company to be filed in a court the company picks, which limits shareholders' choice.—7.8M3.2%
Repurchase under the capped callsBuying back shares. Permission for the company to buy its own shares back from the market, which leaves each remaining share a larger slice of the company.—0.5M0.2%
Director elections at each AGMElect the whole board every year. Where only a third of the directors stand each year, it takes three years to replace the board. Annual elections make every seat answerable to shareholders every year, so shareholders gain power; a no keeps the board harder to remove.—0.2M0.1%

Insiders who sold the most stock

Reported sales by executives and directors, biggest first.

Form 4s, Jul '25-Jun '26SoldNote
Daniel Roberts, co-CEO$33.1M1,000,000 shares at $33.131 on 11 Sep '25, through a family trust, outside any plan
William Roberts, co-CEO$33.1Mthe same number at the same price on the same day, through the other trust
Everyone else$0no other insider sale in the twelve months, and no purchase by anyone